Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25
|
Observations: Name: MAIN BUILDING 01 - Component: 01 - Tag: 0353
Based on observation and interview, the facility failed to maintain the automatic sprinkler system in two instances, affecting two of eighteen smoke compartments.
Findings include:
Observation on September 8-9, 2026, revealed the following deficiencies, which may affect the operation of the automatic sprinkler system:
a) 10:00 a.m., There were two penetrations above the ceiling tile by the stairs to the behavioral health unit; b) 11:00 a.m., There were two missing drop ceiling tiles in the activity director's office.
Interview with the facility administrator and maintenance director on September 9, 2026, at 11:30 a.m., confirmed the automatic sprinkler system deficiencies.
| | Plan of Correction - To be completed: 09/25/2026
The two penetrations above the ceiling tile by the stairs to the behavioral health unit were repaired the day of survey. Also, the two missing drop ceiling tiles in the Activity Director's office were replaced the day of survey.
These were isolated issues and no other areas are affected.
Director of Maintenance will re-educate maintenance staff on these issues. Director of Maintenance will complete an audit of 3 random areas weekly x 4 then monthly x 2 to ensure compliance is met and maintained.
Findings will be reviewed at the monthly facility Quality Assurance and Performance Improvement meeting to determine continued frequency of audits.
|
|