Pennsylvania Department of Health
HAIDA NURSING AND REHAB
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
HAIDA NURSING AND REHAB
Inspection Results For:

There are  39 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
HAIDA NURSING AND REHAB - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: - Component: -- - Tag: 0000



Based on an Emergency Preparedness Survey completed on December 1, 2025, it was determined that Haida Nursing and Rehab had deficiencies that have the potential for minimal harm as related to the requirements of 42 CFR 483.73.


 Plan of Correction:


Initial comments:Name: MAIN BUILDING 01 - Component: 01 - Tag: 0000



Facility ID# 340102
Component 01
Main Building

Based on a Medicare/Medicaid Recertification Survey completed on December 1, 2025, it was determined that Haida Nursing and Rehab was not in compliance with the following requirements of the Life Safety Code for an existing healthcare occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.90(a).

This is a one-story, Type V (000), unprotected wood frame structure, that is fully sprinklered.


 Plan of Correction:


NFPA 101 STANDARD Sprinkler System - Maintenance and Testing:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0353


Based on observation and interview, it was determined the facility failed to maintain the automatic sprinkler system in two instances, affecting two of seven smoke compartments.

Findings include

1. Observation on December 1, 2025, revealed the following automatic sprinkler system deficiencies:

a) 10:50 a.m., there was a sprinkler head covered in lint and dust above the dryers in the laundry room;
b) 11:10 a.m., there was a PVC conduit being supported by a sprinkler pipe above the ceiling outside of A Wing.

Interview with the Facility Administrator and Maintenance Director on December 1, 2025, at 11:40 a.m., confirmed the automatic sprinkler system deficiencies.



 Plan of Correction - To be completed: 12/17/2025

1.) The sprinkler head covered in lint and dust above the dryers in the laundry room was cleaned. The PVC conduit that was being supported by a sprinkler pipe above the ceiling outside of A Wing will be raised with wood so it is no longer supported by the sprinkler pipe.
2.) A full house audit of sprinkler heads will be completed by Maintenance to ensure cleanliness. Any concerns identified will be corrected at the time of audit. An audit of the sprinkler pipes will be completed to ensure nothing is resting or being supported by a sprinkler pipe.
3.) Education to Maintenance department on maintenance and testing the automatic sprinkler system and standpipe systems.
4.) An audit of the sprinkler heads will be completed by Maintenance Director or designee monthly times 3 months to ensure cleanliness. An audit of the sprinkler line will be completed by Maintenance Director or designee monthly times 3 months to ensure nothing is resting on the pipes. Results of the audit will be reported at the Quality Assurance Performance Improvement meeting.


Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port