Corridor - Doors Doors protecting corridor openings in other than required enclosures of vertical openings, exits, or hazardous areas resist the passage of smoke and are made of 1 3/4 inch solid-bonded core wood or other material capable of resisting fire for at least 20 minutes. Doors in fully sprinklered smoke compartments are only required to resist the passage of smoke. Corridor doors and doors to rooms containing flammable or combustible materials have positive latching hardware. Roller latches are prohibited by CMS regulation. These requirements do not apply to auxiliary spaces that do not contain flammable or combustible material. Clearance between bottom of door and floor covering is not exceeding 1 inch. Powered doors complying with 7.2.1.9 are permissible if provided with a device capable of keeping the door closed when a force of 5 lbf is applied. There is no impediment to the closing of the doors. Hold open devices that release when the door is pushed or pulled are permitted. Nonrated protective plates of unlimited height are permitted. Dutch doors meeting 19.3.6.3.6 are permitted. Door frames shall be labeled and made of steel or other materials in compliance with 8.3, unless the smoke compartment is sprinklered. Fixed fire window assemblies are allowed per 8.3. In sprinklered compartments there are no restrictions in area or fire resistance of glass or frames in window assemblies.
19.3.6.3, 42 CFR Parts 403, 418, 460, 482, 483, and 485 Show in REMARKS details of doors such as fire protection ratings, automatics closing devices, etc.
|
Observations: Name: MAIN BUILDING 01 - Component: 01 - Tag: 0363
Based on observation and interview, the facility failed to maintain corridor doors in five instances, affecting five of seven smoke compartments.
Findings include:
Observation on September 1, 2026, revealed the following corridor door deficiencies:
a) 10:10 a.m., The door to the office across from the visitor restroom would not close and latch, and the door had penetrations near the handle; b) 10:25 a.m., The door to room 304 would not close and latch; c) 10:40 a.m., The door to room 205 would not close and latch; d) 10:50 a.m., The door to the tel/elec room north would not close and latch; e) 11:05 a.m., The door to the transitional apartment would not close and latch.
Interview with the facility administrator and maintenance director on September 1, 2026, at 12:30 p.m., confirmed the corridor door deficiencies.
| | Plan of Correction - To be completed: 09/25/2026
1.The maintenance director or designee has fixed the doors across from the visitor restroom, room 304, room 205, tel/elec room north, and transitional apartment and they all now self-close and latch properly. 2.The maintenance director or designee has inspected all other self-closing doors to ensure that they close and latch properly. No issues noted. 3.The maintenance director or designee will add checking self-closing doors to their quarterly safety checklist audit. All findings will be reported to QAPI.
|
|