Rubbish Chutes, Incinerators, and Laundry Chutes 2012 EXISTING (1) Any existing linen and trash chute, including pneumatic rubbish and linen systems, that opens directly onto any corridor shall be sealed by fire resistive construction to prevent further use or shall be provided with a fire door assembly having a fire protection rating of 1-hour. All new chutes shall comply with 9.5. (2) Any rubbish chute or linen chute, including pneumatic rubbish and linen systems, shall be provided with automatic extinguishing protection in accordance with 9.7. (3) Any trash chute shall discharge into a trash collection room used for no other purpose and protected in accordance with 8.4. (Existing laundry chutes permitted to discharge into same room are protected by automatic sprinklers in accordance with 19.3.5.9 or 19.3.5.7.) (4) Existing fuel-fed incinerators shall be sealed by fire resistive construction to prevent further use. 19.5.4, 9.5, 8.4, NFPA 82
|
Observations: Name: MAIN BUILDING THOMPSON - Component: 01 - Tag: 0541 Based on observation and interview, it was determined the facility failed to maintain the positive latching of access doors to linen chutes, affecting one of ten of smoke compartments within the component.
Findings include:
1. Observation on August 24, 2026, at 12:20 PM, revealed the access door, to the 1st floor linen chute, located within Storage Room T170, failed to automatically close and positively latch within the frame.
Interview with the Vice President of Facility Services on August 24, 2026, at 12:20 PM, confirmed the access door failed to positively latch within the frame.
| | Plan of Correction - To be completed: 09/22/2026
- The Storage Room T170 door latching mechanism was repaired to enable the door to properly close. - All doors with the same time of latching mechanism were reviewed to ensure that they close properly. - The Maintenance team was re-educated by the Vice President of Facility Services on the requirements of this regulation. - The Assistant Administrator or Designee will re-educate the floor staff on the requirements of this regulation. - All doors with this latching mechanism will be audited monthly x three months and then monthly thereafter to ensure compliance with this regulation. - This audit will be reviewed by the Facility Quality Assurance / Process Improvement team for further recommendations.
|
|