Building Construction Type and Height 2012 EXISTING Building construction type and stories meets Table 19.1.6.1, unless otherwise permitted by 19.1.6.2 through 19.1.6.7 19.1.6.4, 19.1.6.5
Construction Type 1 I (442), I (332), II (222) Any number of stories non-sprinklered and sprinklered 2 II (111) One story non-sprinklered Maximum 3 stories sprinklered 3 II (000) Not allowed non-sprinklered 4 III (211) Maximum 2 stories sprinklered 5 IV (2HH) 6 V (111) 7 III (200) Not allowed non-sprinklered 8 V (000) Maximum 1 story sprinklered Sprinklered stories must be sprinklered throughout by an approved, supervised automatic system in accordance with section 9.7. (See 19.3.5) Give a brief description, in REMARKS, of the construction, the number of stories, including basements, floors on which patients are located, location of smoke or fire barriers and dates of approval. Complete sketch or attach small floor plan of the building as appropriate.
|
Observations: Name: MAIN BUILDING 01 - Component: 01 - Tag: 0161
Based on observation and interview, it was determined the facility failed to maintain building construction requirements in three instances, affecting one of four floors.
Findings include:
1. Observation on September 14, 2026, between 10:12 a.m., and 10:26 a.m., revealed the following:
a. 10:12-10:20 a.m., missing ceiling tiles, located within the Breakroom and within the non-use, first floor UPMC Suite area. b. 10:16 a.m., portable air conditioning exhaust duct work vented into interstitial space within the UPMC office and lacked fire damper. c. 10:26 a.m., two, non-rated, ceiling-mounted drip trays were located within the first floor, Therapy.
Exit interview on September 14, 2026, between 11:20 a.m., and 11:30 a.m., with the Facility Administrator and the Facilities Manager, confirmed the building construction deficiencies.
| | Plan of Correction - To be completed: 10/10/2026
1. Missing ceiling tiles were replaced with appropriate ceiling tiles of the required type and rating for the affected areas. . The exhaust duct will be appropriately terminated or the equipment will be relocated/removed as necessary. The drip trays will be removed or replaced with appropriately approved/rated equipment as determined by the facility's qualified maintenance personnel and/or qualified contractor.
2. The Director of Maintenance or designee conducted a facility-wide inspection of all resident care areas, common areas, offices, therapy areas, mechanical/interstitial areas, and other applicable areas to identify: Missing or damaged ceiling tiles and Improper ceiling penetrations
3. The Director of Maintenance or designee will ensure that the facility's routine Life Safety rounds include inspection of Ceiling tiles and ceiling systems.
4. Maintenance staff will be educated on when doing life safety rounds to ensure ceiling tiles are in place.
5. The Director of Maintenance or designee will complete a weekly Life Safety building construction audit for four consecutive weeks to ensure ceiling tiles are not missing and there is no improper ceiling penetrations. If deficiencies are found they will be addressed immediately and results of audit will be reviewed monthly during QAPI
|
|