Pennsylvania Department of Health
IVY PARK POST ACUTE
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
IVY PARK POST ACUTE
Inspection Results For:

There are  42 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
IVY PARK POST ACUTE - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: - Component: -- - Tag: 0000


Based on an Emergency Preparedness Survey completed on August 18, 2026, at Ivy Park Post Acute, it was determined there were no deficiencies identified with the requirements of 42 CFR 483.73.





 Plan of Correction:


Initial comments:Name: MAIN BUILDING 01 - Component: 01 - Tag: 0000


Facility ID #090302
Component 01
Main Building

Based on a Medicare/Medicaid Recertification Survey completed on August 18, 2026, it was determined that Ivy Park Post Acute was not in compliance with the following requirements of the Life Safety Code for an existing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.90(a).

This is a four-story, Type II (222), fire resistive building, without a basement, that is fully sprinklered.







 Plan of Correction:


NFPA 101 STANDARD Emergency Lighting:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
Emergency Lighting
Emergency lighting of at least 1-1/2-hour duration is provided automatically in accordance with 7.9.
18.2.9.1, 19.2.9.1
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0291

Based on document review and interview, the facility failed to maintain emergency lighting in one instance, affecting the entire facility.

Findings include:

Document review on August 18, 2026, at 8:40 a.m., revealed the facility lacked documentation for an annual 90-minute test of the battery back-up emergency lighting.

Interview with the facility administrator and maintenance director on August 18, 2026, at 12:30 p.m., confirmed the documentation was unavailable at the time of the inspection.


















 Plan of Correction - To be completed: 09/02/2026

The facility completed the annual 90-minute test of the battery back-up emergency lighting on 9/1/26. This test is logged in TELS to be performed each September, ensuring compliance each year.
NFPA 101 STANDARD Fire Alarm System - Testing and Maintenance:This is a less serious (but not lowest level) deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents.  This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0345

Based on document review and interview, the facility failed to maintain the fire alarm system in one instance, affecting the entire facility.

Findings include:

Observation and document review on August 18, 2026, at 9:10 a.m., revealed the facility failed to perform annual fire alarm testing and inspection.

Interview with the facility administrator and maintenance director on August 18, 2026, at 12:30 p.m., confirmed the annual fire alarm inspection testing was not conducted in the last 12 months.














 Plan of Correction - To be completed: 09/02/2026

The facility completed the annual fire alarm testing and inspection on 8/24/26. The testing and inspection is logged in TELS as an annual task, ensuring compliance each year.
NFPA 101 STANDARD Sprinkler System - Maintenance and Testing:This is a less serious (but not lowest level) deficiency and is isolated to the fewest number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0353

Based on observation and interview, the facility failed to maintain the automatic sprinkler system in two instances, affecting one of ten smoke compartments.

Findings include:

Observation on August 18, 2026, revealed the following automatic sprinkler system deficiencies:

a) 9:55 a.m., There were two unsealed penetrations in the ceiling of the janitor's closet, first floor kitchen, that would allow the passage of heat and smoke and may affect operation of the automatic sprinkler system;
b) 10:10 a.m., There were two unsealed penetrations in the ceiling of the elevator equipment room on the first floor.

Interview with the facility administrator and maintenance director on August 18, 2026, at 12:30 p.m., confirmed the ceiling penetrations may affect operation of the fire sprinklers.










 Plan of Correction - To be completed: 09/18/2026

The identified unsealed penetrations have since been fire-caulked. A whole-house audit of unsealed penetrations will be conducted, and any unsealed penetrations will be promptly resolved.
NFPA 101 STANDARD Fire Drills:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0712

Based on document review and interview, the facility failed to perform five of twelve required fire drills.

Findings include:

Review of fire drill reports on August 18, 2026, at 8:40 a.m., revealed the facility lacked documentation for the following quarterly fire drills:

a) Third shift, first quarter;
b) Second shift, second quarter;
c) Third shift, second quarter;
d) First shift, third quarter;
e) Third shift, fourth quarter.

Interview with the facility administrator and maintenance director on August 18, 2026, at 12:30 p.m., confirmed the missing fire drill documentation.















 Plan of Correction - To be completed: 09/02/2026

The maintenance director was educated on the need for fire drills quarterly on each shift at varying hour time slots.

An audit will be completed by the Administrator and/or designee for the next quarter to ensure that the appropriate fire drills are taking place.

Audit results will be reviewed by the facility Quality Assurance & Performance Improvement Committee to determine compliance or need for continuation of audits.
NFPA 101 STANDARD Electrical Systems - Essential Electric Syste:This is a less serious (but not lowest level) deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents.  This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70)
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0918

Based on document review and interview, the facility failed to perform emergency generator maintenance and testing in one instance, affecting the entire facility.

Findings include:

Document review on August 18, 2026, at 9:15 a.m., revealed the facility lacked documentation for an annual emergency generator load test.

Interview with the facility administrator and maintenance director on August 18, 2026, at 12:30 p.m., confirmed the annual generator testing documentation was unavailable at the time of the survey.














 Plan of Correction - To be completed: 09/18/2026

The facility will exercise the generator under load for 4 continuous hours once every 36 months. The facility is currently in the process of scheduling the load test.

Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port