INITIAL COMMENTS |
Based on the concerns arising from COVID-19, The Department of Drug and Alcohol Programs, Bureau of Quality Assurance for Prevention and Treatment, has implemented temporary procedures for conducting an annual renewal inspection.
The inspection will be divided into two parts.
1, an abbreviated off-site inspection, will be conducted off site, and will require the submission of administrative information via email to a Licensing Specialist.
2, an abbreviated on-site inspection, will be conducted on-site, at a later date and will include a review of client/patient records, and a physical plant inspection.
This report is a result of Part 1, an abbreviated off-site inspection, conducted on May 14, 2020 by staff from the Department of Drug and Alcohol Programs, Bureau of Quality Assurance for Prevention and Treatment. Not all regulations were reviewed, the remainder of the regulations, not reviewed during Part 1, will be reviewed at a later date.
Based on the findings of Part 1, an abbreviated off-site inspection, Diakon Family Life Services was found not to be in compliance with the applicable chapters of 28 PA Code which pertain to the facility. The following deficiencies were identified during this inspection: |
Plan of Correction
|
704.11(d)(2) LICENSURE Annual Training Requirements
704.11. Staff development program.
(d) Training requirements for project directors and facility directors.
(2) A project director and facility director shall complete at least 12 clock hours of training annually in areas such as:
(i) Fiscal policy.
(ii) Administration.
(iii) Program planning.
(iv) Quality assurance.
(v) Grantsmanship.
(vi) Program licensure.
(vii) Personnel management.
(viii) Confidentiality.
(ix) Ethics.
(x) Substance abuse trends.
(xi) Developmental psychology.
(xii) Interaction of addiction and mental illness.
(xiii) Cultural awareness.
(xiv) Sexual harassment.
(xv) Relapse prevention.
(xvi) Disease of addiction.
(xvii) Principles of Alcoholics Anonymous and Narcotics Anonymous.
|
Observations Based on a review of six personnel records, the facility failed to document the completion of 12 clock hours of annual training required for project directors in employee #1's employee record.
Employee # 1 was hired as a project director on December 1, 2016 and was still in this position at the time of the inspection. The facility's training year that was reviewed was from January 1, 2019 through December 31, 2019. Employee #1's personnel record documented 0 hours of annual training for the training year reviewed.
These findings were reviewed with facility staff during the licensing process.
|
Plan of Correction 704.11(d) (2) was reviewed with the Project Director on 5/20/20 noting the required clock hours of annual training. Quarterly monitoring of this regulation will be completed by the Facility Director, with written reminders to staff on the training requirements as well as training feedback. All required annual trainings will be completed by the December 31st deadline. Compliance with this standard will be monitored and enforced by the Facility Director |
705.10 (d) (1) LICENSURE Fire safety.
705.10. Fire safety.
(d) Fire drills. The residential facility shall:
(1) Conduct unannounced fire drills at least once a month.
|
Observations Based on a review of the facility fire drill log, there was not an unannounced fire drill conducted in the month of August 2019.
These findings were reviewed with facility staff during the licensing process.
|
Plan of Correction 705.10(d) (1) was reviewed with facility staff on 5/20/20. Unannounced fire drills will be completed a minimum of one time per month. Compliance with this standard will be monitored and enforced by the Facility Director. |
709.26 (b) (3) LICENSURE Personnel management.
§ 709.26. Personnel management.
(b) The personnel records must include, but are not limited to:
(3) Annual written individual staff performance evaluations, copies of which shall be reviewed and signed by the employee.
|
Observations Based on a review of six personnel records, the facility failed to provide documentation of an annual performance evaluation for employee # 1 and employee # 6.
Employee # 1 was hired as the Project Director on December 1, 2016 and was still in this position at the time of the inspection. An annual performance evaluation was not conducted for the year 2019.
Employee # 6 was hired as a Counselor on March 25, 2019 and was still in this position at the time of the inspection. An annual performance evaluation due on March 25, 2020 was not documented in the employee personnel record.
These findings were reviewed with facility staff during the licensing process.
|
Plan of Correction 709.26(b)(3) was reviewed with the Project Director on 5/20/20 regarding annual written performance evaluations and the 2019 annual performance plan was completed and signed by the Project Director on 5/21/20. Performance evaluations will be completed in writing and signed by all employees on an annual basis. The 2019 performance evaluation was completed for employee #6 on 5/18/20. Compliance with this standard will be monitored and enforced by the Facility Director. |