Observations Based on a physical plant inspection, the facility failed to maintain each bathroom in a functional, clean and sanitary manner at all times.During the physical plant inspection, a black mold-like substance was observed on the shower floors and walls in the main bathroom.In addition, a cracked toilet seat was observed in the staff restoom. These findings were reviewed with facility staff during the investigation process.
|
Plan of Correction On February 9th, facility maintenance removed all stains located in the back shower area using a cleansing agent, and replaced the seat in the staff restroom. The clinical team will monitor the condition of the shower room during daily house inspections. |