This report is a result of an on-site physical plant inspection conducted for a capacity increase request. The inspection was conducted on June 15, 2010 by staff from the Division of Drug and Alcohol Program Licensure. Based on the findings of the on-site inspection, Cove Forge Behavioral Health System At Williamsburg was not prepared for the physical plant inspection relative to the capacity increase. However, prior to completion of the written report, the facility was able to provide verification that the new building was ready to receive patients and the facility was found to be in compliance with the applicable chapters of 28 PA Code which pertain to the facility. Therefore, no deficiencies were identified during this inspection and no plan of correction is required. |
Plan of Correction
|