Observations Based on a physical plant inspection conducted during a complaint investigation on December 4, 2024, the facility failed to maintain each bathroom in a functional, clean and sanitary manner at all times.
The bathroom shower located in client bedroom 118 was observed to have a black mold-like substance in the right corner area of the shower walls.
The vinyl-like material shower covering was missing from the front of the shower step in the same bathroom.
This was discussed with facility staff at the time of the investigation.
|
Plan of Correction In response to the bathroom in room 118; Maintenance remedied this by epoxying the shower basin on 12/17/2024. Ongoing inspection of the bathrooms will be a part of monthly physical plant walk-throughs facilitated by maintenance. Additionally, housekeeping will check for "black mold-like" substances in the showers during daily cleaning and remove if observed. |