Observations Based on a physical plant inspection, the facility failed to ventilate the first floor men's bathroom by exhaust fan or window.
The findings include:
A physical plant inspection was conducted with the Project/Facility Director on March 14, 2013 at approximately 11:45 AM. The first floor men's restroom, near the reception area, was observed to not have an operable exhaust fan or window.
The Project/Facility Director was interviewed on March 14, 2013 and confirmed the findings.
|
Plan of Correction Exhaulst fan has already been installed and is fully functioning in the men's room, 1st floor.
Project Director shall:
1.Secure licensed electrician to purchase replacement exhalst fan
by 03-27-2013
2.Secure licensed elctrician to install exhalst fan by 03-27-2013
3.Confirm operation of exhalst fan operating by 03-27-2013
4.Continue to check 1st floor men's bathroom and all other bathrooms in facility at least monthly to insure units are functioning.