Observations Based on a physical plant inspection, the facility failed to keep the water temperature from exceeding 120 degrees Fahrenheit. The water temperature was read at 139 degrees Fahrenheit.
These findings were reviewed with the recovery house staff during the licensing process.
|
Plan of Correction Plan of Correction for DDAP Recovery House # KW8R6701
Today Date: 6/13/2025
The Deficiencies: This report is a result of an on-site licensure renewal inspection conducted on June 4, 2025, by staff from the Bureau of Program Licensure.Based on a physical plant inspection, the facility failed to keep the water temperature from exceeding 120 degrees Fahrenheit. The water temperature was 133 degrees Fahrenheit. These findings were reviewed with the recovery house staff during the licensing process.
The Corrective Action: on June 4th 2025, during the inspection, the hot water heater's temperature gauge was adjusted to reach 120 degrees Fahrenheit.
The Responsible Party: Recovery House Manager
Completion Date: June 5th 2025
Measure to Prevent Recurrence: Our team ordered digital thermometers to be placed at each house for checking water temperature. We also included a monthly check for water temperature in each house. To document and track, we added in a space to document the water temperature when we do the monthly smoke detector test. |