bar
Pennsylvania Department of Drug & Alcohol Programs
Inspection Results

bar

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.

NASR CONSULTANT GROUP, INC.
2422 LOCUST LANE
HARRISBURG, PA 17109

Inspection Results   Overview    Definitions       Surveys   Additional Services   Search

Survey conducted on 06/23/2025

INITIAL COMMENTS
 
This report is a result of an on-site complaint investigation conducted on June 23, 2025, by staff from the Bureau of Program Licensure. Based on the findings of the on-site complaint investigation, Nasr Consultant Group, Inc., was found not to be in compliance with the applicable chapters of 28 PA Code which pertain to the facility.
 
Plan of Correction

705.26 (1)  LICENSURE Heating and cooling.

705.26. Heating and cooling. The nonresidential facility: (1) Shall have a heating and cooling ventilation system that is adequate to maintain an indoor temperature of at least 65F in the winter. When indoor temperatures exceed 90F, mechanical ventilation such as fans or air conditioning shall be used.
Observations
Based on a physical plant inspection, it was observed that the facility failed to ensure that when indoor temperatures exceed 90 F, mechanical ventilation such as fans or air conditioning shall be used.



DDAP staff took the following temperature readings throughout the building:





Facility Lobby-95 degrees

Bedroom B5-90 degrees

Bedroom A3-93 degrees

Bedroom A1-91 degrees

Bedroom A2-90 degrees

Kitchen (not in use at the time) 90 degrees

Bedroom B6- 92 degrees

Bedroom B1- 89 degrees

Bedroom B2-90 degrees

Bedroom B4-90 degrees

Bedroom B6-90 degrees







The facility did employ use of portable fans in the facilty; however, the overall temperature of the facility still remained at of 90 F degrees.



This finding was reviewed with facility staff during the complaint investigation.
 
Plan of Correction
Within 24 hours of the inspection, the Executive Director hired a contractor to replace the old air conditioning unit with a new, high-capacity unit to cool the facility's lobby, kitchen, and all residential bedrooms, which had exceeded 90°F. Facility staff also repositioned fans to improve airflow efficiency and reduce heat concentration in enclosed spaces. New thermostats have been installed to allow monitoring of indoor temperatures.



The installation was to be completed by June 25, 2025.



The on-duty House Coordinator will monitor the indoor temperature daily to ensure all interior rooms remain under 90°F. Furthermore, during hot weather forecasts (above 85°F), the on-duty House Coordinator will use proactive cooling strategies to prevent temperatures from exceeding limits. In the event temperatures do exceed the limits, the on-call HVAC specialist will be contacted by the on-duty House Coordinator to address the issue.

 
Pennsylvania Department of Drug and Alcohol Programs Home Page


Copyright @ 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement