Observations During a physical plant inspection conducted on December 20, 2018 within the Carole Neag building, an outdoor egress area was observed to be of hazard for residents, employees, and visitors.
The exit egress consisted of an uneven earthen path that was sloping and narrow in some locations which would present a hazard when exiting especially for wheel chair dependant individuals, particularly during inclement weather conditions.
These findings were reviewed with facility staff during the licensure inspection.
|
Plan of Correction The uneven earthen path from the Neag exit will be leveled and a path of 2A stone and P gravel will be placed until a paved asphalt path can be installed. This stone and gravel path will be completed by March 1, 2019.
Weather permitting, a paved path will be installed by April 1, 2019 from the Neag building exit egress to the paved driveway. This paved path will allow individuals who are wheel chair dependent to exit the building in emergency situations. The Corporate Director of Facilities will ensure all work is completed per the plan of correction.
|