QA Investigation Results

Pennsylvania Department of Health
THE VERLAND FOUNDATION INC REAGHARD
Building Inspection Results

THE VERLAND FOUNDATION INC REAGHARD
Building Inspection Results For:


There are  3 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - Component - --
Based on aa revisit to an Emergency Preparedness Survey completed on September 28, 2023, it was determined that The Verlabnd Foundation Reaghard was in substantial compliance with the requirements of 42 CFR 483.475.





Plan of Correction:




Initial Comments:
Name - VERLAND REAGHARD Component - 01
Based on a revisit to a Medicaid Recertification Survey completed on September 28, 2023, it was determined that The Verland Foundation Reaghard was in substantial compliance with the requirements of the Life Safety Code for an exixting ICF/IID health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.470(j).

This is a one story, Type V (000), unprotected ordinary building, with an attic, that is fully sprinklered.

State plans approved as slow.






Plan of Correction: