QA Investigation Results

Pennsylvania Department of Health
UNIONTOWN HOSPITAL
Building Inspection Results

UNIONTOWN HOSPITAL
Building Inspection Results For:


There are  86 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01
Facility ID# 470901
Component 01
Main Hospital

Based on an Occupancy Survey completed on February 20, 2024, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.

This Final Occupancy Survey was conducted for alterations to renovate two areas on the ground floor. Renovations include relocation of the imaging staff lounge and locker room to provide a specialty outpatient clinic. Refer to Drawing Index Number H-23-1042.

This is a five-story, Type II (222), fire resistive building, with a basement and sub-basement, that is partially sprinklered.


Plan of Correction: