QA Investigation Results

Pennsylvania Department of Health
ENCOMPASS HEALTH REHABILITATION HOSPITAL OF NITTANY VALLEY
Building Inspection Results

ENCOMPASS HEALTH REHABILITATION HOSPITAL OF NITTANY VALLEY
Building Inspection Results For:


There are  19 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID# 342601
Component 01
Main Building

Based on an Occupancy Survey completed on October 3, 2023, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.

This onsite phase 6, Occupancy Survey was conducted for alterations for interior renovation to patient wings to convert the existing patient rooms to all private rooms, making the 73-bed facility into a 46-bed facility. Included is the conversion of common shower rooms to staff support areas and cosmetic upgrades of the remaining interior spaces. Phase 6 is for work associated with drawing phase 3A, 3B and 3C.

Refer to drawing index numbers; H-21-1252, H-22-0896, H-22-1241 and H-23-0188.

This is a one story, Type V (000), unprotected, wood-frame building, that is fully sprinklered.






Plan of Correction: