QA Investigation Results

Pennsylvania Department of Health
HOSPITAL OF THE UNIVERSITY OF PENNSYLVANIA, THE
Building Inspection Results

HOSPITAL OF THE UNIVERSITY OF PENNSYLVANIA, THE
Building Inspection Results For:


There are  358 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - SILVER, DONNER, DULLES, RAV/WHITE, FOUNDERS, GATE Component - 01

Facility ID# 341101
Component 01
Main Hospital - Donner, Dulles, Founders, Gates, Ravdin Court, Ravdin/White, and Silverstein Buildings

Based on an Occupancy Survey conducted on March 5, 2024, and completed on March 8, 2024, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.

This Final Occupancy Survey was conducted for Alterations to renovate an existing suite of four operating rooms 29, 30, 31, 32 and their required support spaces.

Refer to Drawing Numbers H-23-0754, H-23-0013 and H-24-0024.

Areas inspected: on the fourth floor, Dulles, Endoscopy Suite.

This is a fourteen-story, Type II, fire resistive building, with basements and penthouses, that is fully sprinklered.





Plan of Correction: