Initial Comments:
Name - MAIN BUILDING (A/B, C, D, E WINGS COMBINED) Component - 01

Facility ID# 280701
Component 01
Main Building, A/B, C, D and E Wings

Based on an Occupancy Survey completed on May 7, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.

This Phase 1 Occupancy Survey was conducted for alterations to temporarily replace an observation unit to the sixth floor, use the observation unit as E.D. bays and replace the floor in the E.D. in Phases to keep the Emergency Department operational.

Refer to Drawing Number H-23-0692.

This is a seven-story, Type II (222), fire resistive building, with a basement and sub-basement, that is fully sprinklered.






Plan of Correction: