MERAKEY ALLEGHENY VALLEY SCHOOL CENTREVILLE 656 Building Inspection Results For:
There are 25 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - Component - --
Based on a Revisit to an Emergency Preparedness Survey completed on July 20, 2023, at Merakey Allegheny Valley School Centreville 656, it was determined there were no deficiencies identified with the requirements of 42 CFR 483.475.
Plan of Correction:
Initial Comments: Name - MAIN BUILDING 01 Component - 01
Facility ID # 27701100 Component 01 Main Building
Based on a Revisit to a Medicaid Recertification Survey completed on July 20, 2023, it was determined that Merakey Allegheny Valley School Centreville 656 was in substantial compliance with the requirements of the Life Safety Code for an existing ICF/IID health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.470(j).
This is a one-story, Type V (000), unprotected, wood frame building, with a basement, that is fully sprinklered.
State Plans approved as Slow.
Plan of Correction:
| |