JEFFERSON ABINGTON HOSPITAL Building Inspection Results For:
There are 75 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - ELKINS, RORER, WIDENER, HARRISON, BUERGER Component - 01
Facility ID# 270501 Component 01 Harrison, Buerger (formerly Highland), Widener, Elkins, and Rorer Buildings
Based on an Occupancy Survey conducted on May 16, 2025, and completed on May 19, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.
This Final Occupancy Survey was conducted for alterations to provide a mobile CT and MRI units during CT and MRI equipment replacement.
Area Inspected: Temporary enclosure housing mobile unit access.
Refer to Drawing Number H-25-0100, H-24-1192, H-25-0102 and H-25-0424.
This is an eight-story, Type II (222), fire resistive building, with a basement and penthouse, that is partially sprinklered.
Plan of Correction:
| |