QA Investigation Results

Pennsylvania Department of Health
ABINGTON HOSPITAL
Building Inspection Results

ABINGTON HOSPITAL
Building Inspection Results For:


There are  69 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - (BUILDING 2) TOLL PAVILION & LENFEST BUILDINGS Component - 56

Facility ID# 270501
Component 56
Lenfest Building & Toll Pavilion

Based on an Occupancy Survey conducted on December 12, 2022, and completed on December 16, 2022, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital Health Care Occupancy.

This Final Occupancy Survey was conducted for Alterations to create a SAFE Center, existing Emergency Department.

Refer to Drawing Numbers: H-21-1062, Revision H-22-0827, Sprinkler H-22-1226.

This is a six-story, Type II (222), fire resistive construction, with a basement and penthouse, which is fully sprinklered.




Plan of Correction: