CHAN SOON-SHIONG MEDICAL CENTER AT WINDBER Building Inspection Results For:
There are 33 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - Component - --
Based on a revisit to an Emergency Preparedness Survey completed on January 19, 2022, it was determined that Chan Soon-Shiong Medical Center at Windber was in subtantial compliance with the requirements of 42 CFR 482.15.
Plan of Correction:
Initial Comments: Name - WINDBER HOSPITAL [HOSPICE] Component - 04
Facility ID# 234901 Component 04 Hospice Building
Based on a revisit to a Recertification/Relicensure Survey completed on January 19, 2022, it was determined that Chan Soon-Shiong Medical Center at Windber was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 482.41(b).
This is a two-story, Type II (000), unprotected noncombustible building, that is fully sprinklered.
Plan of Correction:
Initial Comments: Name - MAIN BUILDING Component - 12
Facility ID# 234901 Component 12 Main Building
Based on a revisit to a Recertification/Relicensure Survey completed on January 19, 2022 , it was determined that Chan Soon-Shiong Medical Center at Windber was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 482.41(b).
This is a three-story, Type II (222), fire resistive building, that is partially sprinklered.
Plan of Correction:
| |