QA Investigation Results

Pennsylvania Department of Health
JEFFERSON EINSTEIN MONTGOMERY HOSPITAL
Building Inspection Results

JEFFERSON EINSTEIN MONTGOMERY HOSPITAL
Building Inspection Results For:


There are  25 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

ID# 22710101
Component 01
Main Hospital Building

Based on an Occupancy Survey conducted on March 5, 2025 and completed on March 7, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.

This Final Occupancy Survey was conducted for alterations to replace the existing PET/CT equipment on the ground floor making this a class 2 imaging room.

Areas Inspected: Ground floor PET/CT imaging room

Refer to Drawing Numbers H-24-1053, Sprinkler shop drawings H-25-0199

This is a five-story, Type II (222), fire resistive building, with a penthouse, that is fully sprinklered.










Plan of Correction: