UPMC PRESBYTERIAN SHADYSIDE Building Inspection Results For:
There are 580 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - BUILDING 03 Component - 20
Facility ID #163301 Component 20 Montefiore Hospital
Based on an Occupancy Survey completed on May 1, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.
This Final Occupancy Survey was conducted for alterations to a portion of Level 6 where egress corridor, bathroom, and staff areas in the hospital abut to the parking garage occupancy. The existing Garage is also incurring renovation work.
Refer to Drawing Index Numbers: H-24-0220, H-24-1090(Revision), and H-24-1204 (Sprinkler drawings).
This is a twelve-story, Type II (222), fire resistive building, with a basement and penthouse, that is fully sprinklered.
Plan of Correction:
| |