Initial Comments:
Name - Component - --

Based on an Emergency Preparedness Survey completed on January 11, 2024, it was determined that BARC Developmental Services Inc. Route 313 was not in compliance with the requirements of 42 CFR 483.475.




Plan of Correction:




483.475(d)(2) STANDARD
EP Testing Requirements

Name - Component - --
§416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2).

*[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, "Organizations" under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]:

(2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following:

(i) Participate in a full-scale exercise that is community-based every 2 years; or
(A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or
(B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event.
(ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed.

*[For Hospices at 418.113(d):]
(2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following:
(i) Participate in a full-scale exercise that is community based every 2 years; or
(A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.

(3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed.


*[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):]
(2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed.

*[For PACE at §460.84(d):]
(2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed.

*[For LTC Facilities at §483.73(d):]
(2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise.
(B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed.

*[For ICF/IIDs at §483.475(d)]:
(2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or.
(B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed.

*[For HHAs at §484.102]
(d)(2) Testing. The HHA must conduct exercises to test the emergency plan at
least annually. The HHA must do the following:
(i) Participate in a full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or.
(B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed.

*[For OPOs at §486.360]
(d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following:
(i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event.
(ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI's and OPO's] emergency plan, as needed.

*[ RNCHIs at §403.748]:
(d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following:
(i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed.

Observations:

Based on document review and interview, it was determined the facility failed to adhere to the Emergency Preparedness (EP) testing program, affecting the entire facility.

Findings include:

Document review made on January 11, 2024, between 10:30 a.m. and 12:00 p.m., revealed the facility conducted a facility-based exercise of the emergency plan on May 29, 2023. The facility failed to conduct a second annual full-scale community-based, facility-based or a tabletop exercise of the emergency plan in 2023.

Exit Interview with the Maintenance Supervisor on January 11, 2024, at 12:00 p.m., confirmed the facility failed to conduct required exercises of the Emergency Preparedness plan.









Plan of Correction:

1. Once each calendar year during the month of December, a facility-based exercise will be run at each residential location. The facility-based exercise will include locating, packing, and loading of the emergency bins into the agency vehicles, packing of clothing, personal care needs items, first aid kits and medications and loading of these items in the agency vehicles, loading of the individuals and staff into the agency vehicles, recording the time it took to complete the drill and any obstacles encountered. The drill will be unannounced to individuals and non-supervisory workers. Any issues or problems discovered during the facility-based exercise will be reviewed by management and solutions for prevention will be put into place. Documentation is the December Facility-Based Exercise Form.
2. All Supervisors and Direct Support Professionals will be fully trained on the Emergency Preparedness Plan twice annually in the months of June and December. Newly hired associates are trained upon hire. Additionally, in the event of a content change to the Emergency Preparedness Plan, all Supervisors and Direct Support Professionals are trained on the changes. Documentation is the Emergency Preparedness Plan Training Sign Off Form.



Initial Comments:
Name - IMPRACTICAL Component - 01

Facility ID# 15691101
Component 01
1008 Route 313

Based on a Medicaid Recertification Survey completed on January 11, 2024, it was determined that BARC Developmental Services Inc. Route 313 was not in compliance with the following requirements of the Life Safety Code for an existing ICF/IID health care occupancy. Compliance with the National Fire Protection Association ' s Life Safety Code is required by 42 CFR 483.470(j).

This is a one-story, Type V(000), unprotected wood frame building, with a basement, that is fully sprinklered.

State plans approved as Impractical.






Plan of Correction:




NFPA 101 STANDARD
Egress Doors

Name - IMPRACTICAL Component - 01
Egress Doors
2012 EXISTING (Prompt)
Doors and paths of travel to a means of escape shall not be less than 28 inches. Bathroom doors shall not be less than 24 inches. Doors are swinging or sliding. Every closet door latch shall be readily opened from the inside in case of an emergency. Every bathroom door shall be designed to allow opening from the outside during an emergency when locked. No door in any means of escape shall be locked against egress when the building is occupied.
Delayed egress locks complying with 7.2.1.6.1 shall be permitted on exterior doors only. Access-controlled egress locks complying with 7.2.1.6.2 shall be permitted. Forces to open doors shall comply with 7.2.1.4.5.
Door-latching devices shall comply with 7.2.1.5.10. Corridor doors are provided with positive latching hardware, and roller latches are prohibited.
Door assemblies for which the door leaf is required to swing in the direction of egress travel shall be inspected and tested not less than annually in accordance with 7.2.1.15.
33.2.2.5.1 through 33.2.2.5.7, 33.7.7, 42 CFR 483.470(j)(1)(ii)

Observations:

Based on observation, document review, and interview, it was determined the facility failed to maintain fire rated door assemblies, affecting one of three egress doors.

Findings include:

Observation and document review made on January 11, 2024, between 10:30 a.m. and 12:00 p.m., revealed a missing end cap on the basement door leading to the back exit. In addition, this door was not included on the annual door assembly inspection report. The door leaf swings in the direction of egress travel.

Exit Interview with the Maintenance Supervisor on January 11, 2024, at 12:00 p.m., confirmed the egress door requires an adjustment and annual inspection.














Plan of Correction:


1. The missing end cap on the basement door leading to the back exit is being located and will be ordered once located. Once it arrives, it will be installed immediately. The Maintenance Manager has ensured that the basement door leading to the back exit is fully operable as is until the end cap is replaced. Documentation will be the invoice for the end cap and the work order for the end cap.
2. The Maintenance Manager will ensure that the fire doors at all ICF homes are inspected to ensure that they are in place and intact. Any end caps found to be missing will be replaced immediately. Any other problems discovered will be addressed immediately. Documentation will be the Maintenance Technician notes documenting fire door assessment.
3. The Maintenance Manager will add the basement door leading to the back exit at Route 313 to the annual door assembly inspection report. Documentation will be the Inspection Report.
4. The Maintenance Manager will ensure that all ICF homes have all fire doors on the annual door assembly inspection reports. Documentation will be the Inspection Reports.