QA Investigation Results

Pennsylvania Department of Health
UPMC MERCY
Building Inspection Results

UPMC MERCY
Building Inspection Results For:


There are  157 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01
Facility ID#13610100-01
Component 01
Main Building

Based on an Occupancy Survey completed on February 7, 2024, it was determined that there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing healthcare occupancy.

This occupancy survey was conducted for alterations to repair and upgrade the existing fire alarm system throughout the building. This phase two inspection included the McAuley Building. Refer to Drawing Index Number H-22-0048.

This is a twelve-story, Type II (222), fire resistive building, with a basement, which is fully sprinklered.





Plan of Correction: