QA Investigation Results

Pennsylvania Department of Health
PENN HIGHLANDS HUNTINGDON
Building Inspection Results

PENN HIGHLANDS HUNTINGDON
Building Inspection Results For:


There are  38 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01
Facility ID# 101101
Component 01
Main Building

Based on an Occupancy Survey completed on December 8, 2023, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.

This Final Occupancy Survey was conducted for alterations to upgrade pharmacy compounding rooms to USP 800 standards located on the second floor of the main Hospital. Refer To Drawing Index Number, H-22-0909.

This is a four-story, Type II (222), fire resistive building, with a basement, that is partially sprinklered.





Plan of Correction: