QA Investigation Results

Pennsylvania Department of Health
HOLY REDEEMER HOSPITAL
Building Inspection Results

HOLY REDEEMER HOSPITAL
Building Inspection Results For:


There are  60 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - BUILDING (MAIN & TOWER BUILDINGS) Component - 01

Facility ID# 083901
Building 01
Main & Tower Buildings

Based on an Occupancy Survey conducted and completed on July 13, 2023, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.

This Final Occupancy Survey was conducted for alterations to replace the existing catherization equipment and finishes, in Cath Lab 3 (Class 2) 2nd floor.

Refer to Drawing Numbers: H-22-1165 and H-23-0673

This is a five-story, Type II (222), fire-resistive structure, with a basement, that is fully sprinklered.



Plan of Correction: