QA Investigation Results

Pennsylvania Department of Health
UPMC HAMOT
Building Inspection Results

UPMC HAMOT
Building Inspection Results For:


There are  159 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID #082301
Component 01
Main Building

Based on an Occupancy Survey completed on April 3, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing acute and ambulatory health care occupancy.

This Phase 3A and Phase 3B Occupancy Survey was conducted for alterations to expand an imaging suite and add a class 3 imaging room on the second floor. Refer to drawing numbers H-23-1048 (original), H-24-0367 (revision), H-24-0664 (revision), and H-24-0470 (sprinkler).
Phases 3A and 3B involved the anesthesia corridor, referenced in drawing H-23-1048.
This is an eleven-story, Type II (222), fire-resistive building, with a basement and sub-basement, that is fully sprinklered.




Plan of Correction: