UPMC HANOVER Building Inspection Results For:
There are 42 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - MAIN BUILDING Component - 12
Facility ID #081801 Component 12 Main Building
Based on an Occupancy Survey completed on March 6, 2023, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.
This Final Occupancy Survey was conducted for alterations to expand the existing Emergency Department into vacant space, on the 1st floor; to include TDR 1-113, Soiled Holding 1-134, Vendor Equipment 1-135, Consult 1-136, Security 1-003, Vestibule 1-000, Corridor 1-010 & Screening 1-001.
Refer to Drawing Numbers: H-21-1363, H-22-0630, H-22-1176, H-23-0034 & H-23-0220
This is a four-story, Type II (222), fire resistive structure, with a basement and penthouse, which is fully sprinklered.
Plan of Correction:
| |