QA Investigation Results

Pennsylvania Department of Health
UPMC HORIZON
Building Inspection Results

UPMC HORIZON
Building Inspection Results For:


There are  89 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - BUILDING 03 Component - 10

Facility ID # 071901
Component 10
Main Building/Shenango Campus

Based on an Occupancy Survey completed on February 1, 2024, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing acute and ambulatory health care occupancy.

This Final Occupancy Survey was conducted for alterations to replace two air handlers on a first floor roof and a third floor roof. A new chiller is being provided. Refer to drawing numbers H-21-0744 (original), H-22-0489 (revision), and H-23-0464 (revision).

This is a three-story, Type II (222), protected, non-combustible building, that is fully sprinklered.





Plan of Correction: