MERAKEY ALLEGHENY VALLEY SCHOOL CENTREVILLE 338 Building Inspection Results For:
There are 25 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - Component - --
Based on a Revisit to an Emergency Preparedness Survey completed on September 5, 2023, at Merakey Allegheny Valley School-Centerville 338, it was determined the facility was in substantial compliance with the requirements of 42 CFR 483.475.
Plan of Correction:
Initial Comments: Name - MAIN BUILDING 01 Component - 01
Facility ID #27721100 Component 01 Main Building
Based on a Revisit to a Medicaid Recertification Survey completed on September 5, 2023, at Merakey Allegheny Valley School - Centerville 338, it was determined the facility was in substantial compliance with the following requirements of the Life Safety Code for an existing ICF/IID health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.470(j).
This is a two-story, Type V (000), unprotected, wood frame building, that is fully sprinklered.
State plans approved as Impractical.
Plan of Correction:
| |