EAGLEVILLE HOSPITAL Building Inspection Results For:
There are 25 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - Component - --
Based on an Emergency Preparedness Survey completed on January 11, 2023, at Eagleville Hospital, it was determined there were no deficiencies identified with the requirements of 42 CFR 482.15.
Plan of Correction:
Initial Comments: Name - MAIN - BUILDING 03 (D'ARCLAY BUILDING) Component - 34
Facility ID# 051001 Component 03 Building 34 D'Arclay Building
Based on a revisit to a Recertification/Relicensure Survey completed on January 11, 2023, it was determined Eagleville Hospital was in substantial compliance with the requirements of the Life Safety Code for an existing Hospital health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 418.110 (d).
This is a two-story, Type II (000), unprotected noncombustible structure, which is fully sprinklered.
Plan of Correction:
Initial Comments: Name - BUILDING 06 (NEW PATIENT CARE BUILDING) Component - 89
Facility ID# 051001 Component 06 Building 89 New Patient Care Building
Based on a revisit to a Recertification/Relicensure Survey completed on January 11, 2023, it was determined Eagleville Hospital was in substantial compliance with the requirements of the Life Safety Code for an existing Hospital health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 418.110 (d).
This is a two-story, Type II (111), protected noncombustible structure, which is fully sprinklered
Plan of Correction:
| |