DELAWARE COUNTY MEMORIAL HOSPITAL Building Inspection Results For:
There are 21 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - BUILDING 01 (MAIN BUILDING) Component - 01
Facility ID# 041801 Component 01 Main Building
Based on an Occupancy Survey conducted on August 9, 2022, and completed on August 19, 2022, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.
This Final Occupancy Survey was conducted for Alterations to provide an inpatient, non-hospital residential treatment and rehabilitation unit, Fifth Floor.
Areas Inspected: Residential Treatment anf Rehabilitation Unit, Fifth Floor.
Refer to Drawing Numbers: H-20-1235, H-21-1174, H-22-0059, H-22-0254
This is a seven-story, Type II (222), fire resistive construction, with floors 1 through 6 and penthouses, which is partially sprinklered.
Plan of Correction:
| |