CROZER-CHESTER MEDICAL CENTER Building Inspection Results For:
There are 66 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - BUILDING 05 (TAYLOR HOSPITAL MAIN BUILDING) Component - 20
Facility ID #037201 Component 20 Taylor Hospital Main Building
Based on an Occupancy Survey completed on February 5, 2024, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital health care occupancy.
This Final Occupancy Survey was conducted for alterations to relocate Dialysis Machine repair room from the third floor to the ground floor.
Refer to Drawing Number: H-23-1233
This is a five story, Type II (222), fire resistive building, that is fully sprinklered.
Plan of Correction:
| |