QA Investigation Results

Pennsylvania Department of Health
CHAMBERSBURG HOSPITAL, THE
Building Inspection Results

CHAMBERSBURG HOSPITAL, THE
Building Inspection Results For:


There are  43 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID# 036001
Component 01
Main Building

Based on an Occupancy Survey completed on May 20, 2021, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.

This Phase 2 and Final Survey was conducted for alterations to relocate the Pharmacy, from the 1st floor to the 3rd floor, and upgrade to 797 and 800 requirements.

Refer to Drawing Numbers: H-19-1456, H-20-1355 & H-21-0151

This is a five-story, Type II (222), fire resistive structure, with a penthouse and a ground floor, which is fully sprinklered.



Plan of Correction: