QA Investigation Results

Pennsylvania Department of Health
WELLSPAN CHAMBERSBURG HOSPITAL
Building Inspection Results

WELLSPAN CHAMBERSBURG HOSPITAL
Building Inspection Results For:


There are  53 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID #036001
Component 01
Main Building

Based on an Occupancy Survey completed on January 14, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.

This Final Occupancy Survey was conducted for alterations to replace existing air handling unit AHU-3.

Refer to Drawing Number: H-24-0051

This is a five-story, Type II (222), fire resistive structure, with a penthouse and a ground floor, which is fully sprinklered.



Plan of Correction: