QA Investigation Results

Pennsylvania Department of Health
UPMC COLE
Building Inspection Results

UPMC COLE
Building Inspection Results For:


There are  43 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID# 031801
Component 01
A Building

Based on a revisit to a Relicensure Survey completed on March 9, 2023, it was determined that UPMC Cole was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy.

This is a two story, Type II (000), unprotected, noncombustible building, that is fully sprinklered.











Plan of Correction:




Initial Comments:
Name - BUILDING 02 Component - 12

Facility ID# 031801
Component 12
B Building

Based on a revisit to a Relicensure Survey completed on March 9, 2023, it was determined that UPMC Cole was in substantial compliance the following requirements of the Life Safety Code for an existing health care occupancy.

This is a two story, Type II (000), unprotected, noncombustible building, with a partial basement, that is fully sprinklered.





Plan of Correction:




Initial Comments:
Name - BUILDING 03 Component - 23

Facility ID# 031801
Component 23
D Building

Based on a revisit to a Relicensure Survey completed on March 9, 2023, it was determined that UPMC Cole was in substantial compliance with the requirements of the Life Safety Code for an existing health care occupancy.

This is a three story, Type II (222), fire resistive building, with a partial basement, and rooftop mechanical space, that is fully sprinklered.





Plan of Correction: