QA Investigation Results

Pennsylvania Department of Health
JOHN HEINZ INSTITUTE OF REHABILITATION MEDICINE
Building Inspection Results

JOHN HEINZ INSTITUTE OF REHABILITATION MEDICINE
Building Inspection Results For:


There are  26 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 01

Facility ID# 013701
Component 01
Main Building

Based on an Occupancy Survey completed on December 11, 2023, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing health care occupancy.

This final onsite Occupancy Survey was conducted for alterations to install door locking on four doors on the 1st floor.

Refer to Drawing Number H-23-0222.

This is a two story, Type II (111), protected, noncombustible building that is fully sprinklered.






Plan of Correction: