QA Investigation Results

Pennsylvania Department of Health
WELLSPAN GETTYSBURG HOSPITAL
Building Inspection Results

WELLSPAN GETTYSBURG HOSPITAL
Building Inspection Results For:


There are  77 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.



Initial Comments:
Name - MAIN BUILDING Component - 03

Facility ID #01300100
Component 03
Main Building

Based on an Occupancy Survey completed on May 14, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.

This Final Occupancy Survey was conducted for alterations to replace and upgrade existing rooftop AHU-12, and install new chiller units on the roof, and update existing HVAC controls.

Refer to Drawing Number: H-22-0238

This is a two-story, Type II (222), fire resistive structure, with a basement, which is fully sprinklered.



Plan of Correction: