Sprinkler System - Maintenance and Testing Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available. a) Date sprinkler system last checked _____________________ b) Who provided system test ____________________________ c) Water system supply source __________________________ Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system. 9.7.5, 9.7.7, 9.7.8, and NFPA 25
|
Observations: Name: MAIN BUILDING 01 - Component: 01 - Tag: 0353
Based on observation and interview, it was determined the facility failed to maintain the automatic sprinkler system in one location, affecting one of three floors.
Findings include:
1. Observation on March 12, 2024, between 11:07 a.m., and 11:32 a.m., revealed the following:
a. 11:07 a.m., a corroded sprinkler head assembly, located within the lower level, Mechanical Room 11A. b. 11:08 a.m., a ceiling tile, missing within lower level, Mechanical Room 11A. c. 11:32 a.m., items stored within eighteen inches of an adjacent sprinkler head assembly, located within the Dietary freezer.
Exit interview on March 12, 2024, between 12:10 p.m., and 12:20 p.m., with the Facilities Manager confirmed the automatic sprinkler system deficiencies.
| | Plan of Correction - To be completed: 04/30/2024
a. The corroded sprinkler head assembly will be ordered and work will be conducted by vendor to install a new sprinkler head assembly. Quarterly preventative maintenance will be scheduled to inspect all sprinkler head assemblies. Corrective actions will be taken if necessary. The Director of Building Operations and/or designee will monitor for compliance. Completion Date: April 30th, 2024 b. Ceiling tile will be replaced. Environmental Services rounds will be conducted to ensure to that all ceiling tiles are intact, free from damage, or stains. Corrective action will be taken if necessary at the time of the Environmental Services Round
Completion Date: April 30th, 2024
c. All items stored within eighteen inches located in the Dietary freezer have been relocated. Culinary Services will train employees that the minimal vertical clearance between a sprinkler head assembly and material shall be eighteen inches. Culinary Services will also conduct rounds to ensure that all items are stored eighteen inches below a sprinkler head assembly. Corrective action will be taken if necessary at the time of the inspection. Completion Date: April 30th, 2024
|
|