ST. LUKE'S HOSPITAL - UPPER BUCKS CAMPUS Building Inspection Results For:
There are 34 surveys for this facility. Please select a date to view the survey results.
|
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - UPPER BUCKS CAMPUS Component - 10
Facility ID# 170301 Building 10 Upper Bucks Campus
Based on an Occupancy Survey conducted on October 1, 2025, and completed on October 2, 2025, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for a new Hospital health care occupancy.
This Phase 1 Occupancy Survey was conducted for alterations to expand the existing Emergency Department with exception of the IOS Ceiling Mounted Lift in Room 1575 / TRT 8 and CRP1D-25 Circuit.
Areas Inspected: 1-Story Emergency Department Expansion, Decontamination Room, Shell Spaces.
Refer to Drawing Numbers: H-24-0938, H-25-0990, H-25-0490-sprinkler
This is a three-story, Type II (222), fire resistive building, with a basement, that is fully sprinklered.
Plan of Correction:
| |