PENN HIGHLANDS DUBOIS Building Inspection Results For:
There are 144 surveys for this facility. Please select a date to view the survey results.
|
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - BUILDING 03 Component - 10
Facility ID #135501 Component 10 West Campus
Based on an Occupancy Survey completed on May 6, 2026, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy. This Final Occupancy Survey was conducted for alterations to staff areas in the emergency department, west campus. Refer to drawing number H-25-1234 (original). This is a six-story, Type II (222), fire resistive building, with a sub-basement, that is fully sprinklered.
Plan of Correction:
| |