LEHIGH VALLEY HOSPITAL - POCONO Building Inspection Results For:
There are 94 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - MAIN BUILDING Component - 01
Facility ID# 072001 Component 01 Main Building
Based on an Occupancy Survey completed on March 18, 2024, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing hospital health care occupancy.
This onsite final occupancy survey was conducted for revisions to alterations to replace air handing units for the South Wing. Work to be completed so as there will be no interruption to services. Revisions included sprinkler shop drawings.
Refer to drawing index number H-20-0750.
Revisions to drawing index number H-22-0751
This is a six story, Type II (222), fire resistive building, that is partially sprinklered.
Plan of Correction:
| |