THE DEVEREUX FOUNDATION - ROSE VILLA Building Inspection Results For:
There are 21 surveys for this facility. Please select a date to view the survey results.
Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
|
Initial Comments: Name - Component - --
Based on an Emergency Preparedness Survey completed on March 30, 2023, at The Devereux Foundation - Rose Villa, it was determined there were no deficiencies identified with the requirements of 42 CFR 483.475.
Plan of Correction:
Initial Comments: Name - MAIN BUILDING 01 Component - 01
Facility ID# 04251100 Component 01 Building 01
Based on a Medicaid Recertification Survey completed on March 30, 2023, at The Devereux Foundation - Rose Villa, it was determined there were no deficiencies identified under the requirements of the Life Safety Code for an existing ICF/IID health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.470(j).
This is a two-story, Type V (000), unprotected wood frame structure, with a basement and an attic, which is not sprinklered.
State plans approved as "Prompt."
Plan of Correction:
| |