Vertical Openings - Enclosure 2012 EXISTING Vertical openings shall be enclosed or protected per 8.6, unless one of the following conditions exist: 1. Unenclosed vertical openings per 8.6.9.1 are permitted. 2. Unenclosed openings which do not serve as a required means of egress are permitted. 3. Exit access stairs may be unenclosed if they meet the following conditions: Two stories or less a. Building is protected throughout by a supervised sprinkler system per 9.7.1.1(1). b. Total travel distance to outside does not exceed 100 feet. Three stories or less a. Occupant load per story does not exceed 15 people. b. Building is sprinkler protected throughout per 9.7.1.1(1). c. Building contains an automatic smoke detection system per 9.6. d. Activation of the sprinkler system or smoke detection system notifies all occupants of the building. e. Total travel distance to outside does not exceed 100 feet. Floors that are below the street level and are used for storage or any use other than a business occupancy, shall not have any unprotected openings to the business occupancy floors. 21.3.1, 39.3.1.1, 39.3.1.2
|
Observations: Name: LGH AMBULATORY SURGICAL FACILITY - Component: 01 - Tag: 0311
Based on observation and interview, it was determined the facility failed to maintain the rating of vertical chases, in one of seven chases within the component.
Findings include:
1. Observation on January 4, 2024, at 11:40 AM, revealed an unsealed penetration in the two hour chase in HT/WT Bay 14.
Interview with the Facilities Manager on January 4, 2024, at 11:40 AM, confirmed there was a penetration.
| | Plan of Correction - To be completed: 02/09/2024
Action: Penetrations have been fire stopped with Hilti's UL rated fire assembly (Hilti's System # W-L-3065) which is an approved through-wall penetration fire stop system. Photo documentation sent as supporting back-up of work completion.
Responsible Party: Director, Facilities
Completion Date: 01/09/2024
Action: The facility will maintain the rating of the vertical chases.
Responsible Party: Director, Facilities
Completion Date: 01/09/2024
Action: Follow up meeting with Pagoda Electrical, Novastream, James Craft, JCI contractors to discuss expectations for working in hospital environments.
Responsible Party: Director, Facilities
Completion Date: 02/09/2024
Action: Prior to closing any requested above ceiling permit, facilities will conduct an inspection to ensure all work has been completed per code compliance. Results of these inspections will be reported to the LGH ASF Board.
Responsible Party: Director, Facilities
Completion Date: 02/09/2024
|
|