Pennsylvania Department of Health
ST. MARY CENTER FOR REHABILITATION & HEALTHCARE
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
ST. MARY CENTER FOR REHABILITATION & HEALTHCARE
Inspection Results For:

There are  41 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
ST. MARY CENTER FOR REHABILITATION & HEALTHCARE - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: - Component: -- - Tag: 0000


Based on an Emergency Preparedness Survey completed on January 25, 2024, it was determined that St. Mary Center for Rehabilitation & Healthcare had deficiencies that have the potential for minimal harm as related to the requirements of 42 CFR 483.73.





 Plan of Correction:


403.748(d)(2), 416.54(d)(2), 418.113(d)(2), 441.184(d)(2), 482.15(d)(2), 483.475(d)(2), 483.73(d)(2), 484.102(d)(2), 485.542(d)(2), 485.625(d)(2), 485.68(d)(2), 485.727(d)(2), 485.920(d)(2), 486.360(d)(2), 491.12(d)(2), 494.62(d)(2) STANDARD EP Testing Requirements:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
§416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2).

*[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, "Organizations" under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]:

(2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following:

(i) Participate in a full-scale exercise that is community-based every 2 years; or
(A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or
(B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event.
(ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed.

*[For Hospices at 418.113(d):]
(2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following:
(i) Participate in a full-scale exercise that is community based every 2 years; or
(A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.

(3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed.


*[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):]
(2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed.

*[For PACE at §460.84(d):]
(2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed.

*[For LTC Facilities at §483.73(d):]
(2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise.
(B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed.

*[For ICF/IIDs at §483.475(d)]:
(2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or.
(B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed.

*[For HHAs at §484.102]
(d)(2) Testing. The HHA must conduct exercises to test the emergency plan at
least annually. The HHA must do the following:
(i) Participate in a full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or.
(B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed.

*[For OPOs at §486.360]
(d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following:
(i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event.
(ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI's and OPO's] emergency plan, as needed.

*[ RNCHIs at §403.748]:
(d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following:
(i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed.
Observations:
Name: - Component: -- - Tag: 0039

Based on document review and interview, the facility failed to maintain emergency preparedness guidelines for one of one emergency preparedness plan.

Findings include:

Document review on January 25, 2024, at 9:45 a.m., revealed the facility lacked documentation that a table-top exercise was completed within the previous year.

Exit interview with the Maintenance Supervisor on January 25, 2024, at 12:15 p.m., confirmed the emergency preparedness plan did not include the above item.







 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure proper annual testing of emergency plans.
1. The Facility will perform a tabletop exercise for the year 2024 and will continue with yearly tabletop and community-based drills.
2. All staff will be included in tabletop exercise,
3. Education completed with Maintenance staff regarding the need to maintain surge proper annual paperwork for EP plan.
4. Every month the Maintenance Director or designee will EP to ensure we are meeting all requirements. This information will then be entered on a log and will be presented to the monthly QAPI meeting.

Initial comments:Name: MAIN BUILDING 01 - Component: 01 - Tag: 0000


Facility ID# 451402
Component 01
Health Care Building

Based on a Medicare/Medicaid Recertification Survey completed on January 25, 2024, it was determined that St. Mary Center for Rehabilitation & Healthcare was not in compliance with the following requirements of the Life Safety Code for an existing Nursing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.90(a).

This is a one-story, Type V (111), protected wood frame building, with an attic, that is fully sprinklered.





 Plan of Correction:


NFPA 101 STANDARD Sprinkler System - Maintenance and Testing:This is a less serious (but not lowest level) deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents.  This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0353

Based on observation and interview, it was determined that the facility failed to maintain the fire sprinkler system for one of one system.

Findings include:

Observation on January, 25, 2024, between 11:21 a.m. and 11:56 a.m., revealed the following sprinkler system deficiencies:
A. (11:21 a.m.) Resident lounge for "St. Theresa" and "St. Anthony" had a missing escutcheon plate. Missing escutcheon plates can cause a delay in the sprinkler activation;
B. (11:56 a.m.) Sprinkler riser room, had various items boxes and materials from shipping and receiving that obstructed access to the sprinkler components.

Exit interview with the Maintenance Supervisor on January 25, 2024, at 12:15 p.m., confirmed the above sprinkler system defiencies existed.









 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure sprinkler system is operating as designed without missing components.
1. Sprinkler heads listed in 2567 missing escutcheons have had new escutcheons installed, Sprinkler riser room has had all boxes removed from the area and the obstructions have been cleared.
2. Sprinkler heads in the remaining parts of the building have been inspected for missing components, dust, paint or corrosion and found to be in working order. Storage has been removed from any sprinkler rooms on 1/26/24.
3. Education completed with Maintenance staff regarding proper inspection of sprinkler system and its components have been completed.
4. Every month the Maintenance Director or designee will check random sprinkler heads throughout the facility to ensure they are free from dust, paint, corrosion or missing components. This information will then be entered on a log and will be presented to the monthly QAPI meeting.

NFPA 101 STANDARD Corridor - Doors:This is a less serious (but not lowest level) deficiency and is isolated to the fewest number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Corridor - Doors
Doors protecting corridor openings in other than required enclosures of vertical openings, exits, or hazardous areas resist the passage of smoke and are made of 1 3/4 inch solid-bonded core wood or other material capable of resisting fire for at least 20 minutes. Doors in fully sprinklered smoke compartments are only required to resist the passage of smoke. Corridor doors and doors to rooms containing flammable or combustible materials have positive latching hardware. Roller latches are prohibited by CMS regulation. These requirements do not apply to auxiliary spaces that do not contain flammable or combustible material.
Clearance between bottom of door and floor covering is not exceeding 1 inch. Powered doors complying with 7.2.1.9 are permissible if provided with a device capable of keeping the door closed when a force of 5 lbf is applied. There is no impediment to the closing of the doors. Hold open devices that release when the door is pushed or pulled are permitted. Nonrated protective plates of unlimited height are permitted. Dutch doors meeting 19.3.6.3.6 are permitted. Door frames shall be labeled and made of steel or other materials in compliance with 8.3, unless the smoke compartment is sprinklered. Fixed fire window assemblies are allowed per 8.3. In sprinklered compartments there are no restrictions in area or fire resistance of glass or frames in window assemblies.

19.3.6.3, 42 CFR Parts 403, 418, 460, 482, 483, and 485
Show in REMARKS details of doors such as fire protection ratings, automatics closing devices, etc.
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0363

Based on observation and interview, the facility failed to maintain corridor doors for one of over fifty corridor doors.

Findings include:

Observation on January 25, 2024, at 11:27 a.m., revealed the resident room 306 door failed to positively latch in the frame.

Exit interview with the Maintenance Supervisor on January 25, 2024, at 12:15 p.m., confirmed the above corridor door lacked positive latching.







 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure corridor doors will close and latch as per design.
1. Doors were repaired to allow for closure on 1/26/24.
2. Doors throughout the facility were checked to allow for closure on 1/26/24.
3. Education completed with Maintenance staff regarding monitoring doors to ensure they close properly.
4. Every month the Maintenance Director or designee will check random doors throughout the facility to ensure the doors fully close. This information will then be entered on a log and will be presented to the monthly QAPI meeting.

NFPA 101 STANDARD Smoking Regulations:This is a less serious (but not lowest level) deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents.  This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Smoking Regulations
Smoking regulations shall be adopted and shall include not less than the following provisions:
(1) Smoking shall be prohibited in any room, ward, or compartment where flammable liquids, combustible gases, or oxygen is used or stored and in any other hazardous location, and such area shall be posted with signs that read NO SMOKING or shall be posted with the international symbol for no smoking.
(2) In health care occupancies where smoking is prohibited and signs are prominently placed at all major entrances, secondary signs with language that prohibits smoking shall not be required.
(3) Smoking by patients classified as not responsible shall be prohibited.
(4) The requirement of 18.7.4(3) shall not apply where the patient is under direct supervision.
(5) Ashtrays of noncombustible material and safe design shall be provided in all areas where smoking is permitted.
(6) Metal containers with self-closing cover devices into which ashtrays can be emptied shall be readily available to all areas where smoking is permitted.
18.7.4, 19.7.4

Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0741

Based on observation and interview, the facility failed to follow smoking regulations at one of one designated smoking area.

Findings include:

Observation on January 25, 2024, at 11:45 a.m., revealed the facility had an accumulation of cigarette butts on the ground next to the sidewalk and garbage can, located outside the door to the designated smoking area.

Interview with the Maintenance Supervisor on January 25, 2024, at 11:45 a.m., confirmed the above deficiency.






 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure proper smoking area safety.
1. A new Smoking Ash tray separate from trash has been installed in the designated smoking area on 1/26/2024, areas around the smoking area have been cleaned up.
2. Facility wide inspection of any smoking areas has been inspected on 1/26/2024.
3. Education completed with Maintenance staff regarding monitoring smoking areas.
4. Every month the Maintenance Director or designee will check random smoking areas to confirm proper disposal of smoke butts. This information will then be entered on a log and will be presented to the monthly QAPI meeting

NFPA 101 STANDARD Combustible Decorations:Least serious deficiency but affects more than a limited number of residents, staff, or occurrences. This deficiency has the potential for causing no more than a minor negative impact on the resident but is not found to be throughout this facility.
Combustible Decorations
Combustible decorations shall be prohibited unless one of the following is met:
o Flame retardant or treated with approved fire-retardant coating that is listed and labeled for product.
o Decorations meet NFPA 701.
o Decorations exhibit heat release less than 100 kilowatts in accordance with NFPA 289.
o Decorations, such as photographs, paintings and other art are attached to the walls, ceilings and non-fire-rated doors in accordance with 18.7.5.6(4) or 19.7.5.6(4).
o The decorations in existing occupancies are in such limited quantities that a hazard of fire development or spread is not present.
19.7.5.6
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0753

Based on observation and interview, the facility failed to meet requirements for combustible decorations for one of over one hundred doors.

Findings include:

Observation on January 25, 2024, at 11:33 a.m., revealed the resident room 203 door, had Christmas wrapping paper covering over thirty percent of the door.

Exit interview with the Maintenance Supervisor on January 25, 2024, at 12:15 p.m., confirmed the above door was covered with combustible decorations.







 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure no excess of combustible decorations be allowed.
1. The wrapping on Room 203 has been removed on 1/26/2024.
2. Facility wide inspection of any decorations was completed on 1/26/2024.
3. Education completed with Maintenance staff regarding monitoring decorations around the building especially when applied to doors has been completed.
4. Every month the Maintenance Director or designee will check doors and decorations to ensure no excess of decorations is allowed. This information will then be entered on a log and will be presented to the monthly QAPI meeting.

NFPA 101 STANDARD Electrical Systems - Essential Electric Syste:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70)
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0918

Based on document review and interview, the facility failed to maintain essential electric system maintenance and testing for one of two emergency generators.

Findings include:

Document review on January 25, 2024, at 10:40 a.m., revealed the facility lacked documentation to indicate an annual fuel analysis report was conducted for the emergency generator.

Exit interview with the Maintenance Supervisor January 25, 2024, at 12:15 p.m., confirmed the annual fuel analysis report was not available at the time of the survey.







 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to maintain proper generator fuel logs.
1. Fuel Sample Analysis has been ordered with p3 Generator company for one diesel generator.
2. Power Pool Plus (P3) has inspected the generator and they are working as designed. Fuel Samples will be completed annually for the Diesel generator.
3. Education completed with Maintenance staff regarding logs and testing of Fuel Samples.
4. The director or designer will check logs and test monthly for proper documentation. This information will then be entered on a log and will be presented to the QAPI meeting.

NFPA 101 STANDARD Electrical Equipment - Power Cords and Extens:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Electrical Equipment - Power Cords and Extension Cords
Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4.
10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5
Observations:
Name: MAIN BUILDING 01 - Component: 01 - Tag: 0920

Based on observation and interview, it was determined the facility failed to maintain appropriate electrical power cords in two of over four wings.

Findings include:

1. Observation on January 25, 2024, between 10:57 a.m. and 11:56 a.m., revealed the following electrical power cord deficiencies:
A. (10:57 a.m.) Nurses' station, for "St. Catherine" and "St. Francis" wings, had an extension cord being used to supply power to IT equipment;
B. (11:46 a.m.) Training room, had a microwave plugged into a surge protector;
C. (11:56 a.m.) Shipping/ Receiving room, had two extension cords in use.

Exit interview with the Maintenance Supervisor on January 25, 2024, at 12:15 p.m., confirmed the above power cord deficiencies existed.








 Plan of Correction - To be completed: 03/01/2024

This provider submits the following plan of correction in good faith and to comply with Federal Law. This plan is not an admission of wrongdoing, nor does it reflect agreement with the facts and conclusions stated in the statement of deficiencies.
It is the practice of the facility to ensure no power strips or power surge protected outlets supply heat, cooking or medical equipment.
1. Extension cords supplying power to microwave, IT equipment, shipping room has been removed.
2. All surge protectors supplying power to approved devices have been inspected.
3. Education completed with Maintenance staff regarding the need to maintain surge protectors plugged into properly approved devices only.
4. Every month the Maintenance Director or designee will check surge protectors throughout the facility to maintain logs of what they are used for. This information will then be entered on a log and will be presented to the monthly QAPI meeting.


Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary