Pennsylvania Department of Health
MAIN LINE ENDOSCOPY CENTER BALA CYNWYD
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
MAIN LINE ENDOSCOPY CENTER BALA CYNWYD
Inspection Results For:

There are  23 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
MAIN LINE ENDOSCOPY CENTER BALA CYNWYD - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: CLASS B ASF - Component: 01 - Tag: 0000


Facility ID# 16701501
Component 01
Main Building

Based on a Relicensure Survey completed on August 16, 2023, it was determined that Main Line Endoscopy Center was not in compliance with the following requirements of the Life Safety Code for an existing Ambulatory health care occupancy.

This is a nine story, Type II (000), unprotected, noncombustible building, which is fully sprinklered.




 Plan of Correction:


28 Pa. Code § 569.2 STANDARD Fire Alarm System - Testing and Maintenance:State only Deficiency.
Fire Alarm Systems - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5
Observations:
Name: CLASS B ASF - Component: 01 - Tag: 0345

Based on document review and interview, it was determined the facility failed to maintain and inspect the fire alarm system, affecting the entire component.

Findings include:

1. Document review on August 16, 2023, at 8:15 am, revealed the facility could not provide documentation of a semi-annual visual fire alarm inspection within 6 months of May 5, 2023.

Exit interview with the Administrator and Director of Nursing on August 16, 2023, at 9:30 am, confirmed the lack of documentation.



 Plan of Correction - To be completed: 10/03/2023

The Center Administrator notified the Medical Director and Governing Board of the preliminary findings from the agency visit on 8/16/2023.

Fire Alarm System - Testing and Maintenance NFPA 70 National Electric Code and NFPA 72 National Fire Alarm and Signaling Code SO345

Systemic Changes

The Center Administrator contacted the building manager responsible for scheduling the fire alarm system vendor for inspections. The vendor was contacted to schedule the semi-annual fire alarm visual inspection on 10/3/2023. The Center Administrator will verify inspection documents with the building manager and vendor, prior to the vendor exit, to confirm that the inspection was completed.

Monitoring and Sustaining the Plan

The inspection is completed, the Center Administrator will place a reminder on the calendar to contact the vendor no less than 30 days prior to the next inspection due date.

Responsible Party and Reporting

The Center Administrator is responsible for compliance with the content of this Plan of Correction.

Documentation of compliance is reported to and reviewed by the Quality Assessment and Performance Improvement (QAPI) and Medical Executive Committee (MEC) Committees. Minutes from QAPI/ MEC Committee meetings will serve as a validation that the groups were informed, and that the systemic changes addressed here were recommended to the Governing Board for approval at the next scheduled meeting.

Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port