| 403.748(a), 416.54(a), 418.113(a), 441.184(a), 482.15(a), 483.475(a), 483.73(a), 484.102(a), 485.542(a), 485.625(a), 485.68(a), 485.727(a), 485.920(a), 486.360(a), 491.12(a), 494.62(a) STANDARD Develop EP Plan, Review and Update Annually: |  |
§403.748(a), §416.54(a), §418.113(a), §441.184(a), §460.84(a), §482.15(a), §483.73(a), §483.475(a), §484.102(a), §485.68(a), §485.542(a), §485.625(a), §485.727(a), §485.920(a), §486.360(a), §491.12(a), §494.62(a).
The [facility] must comply with all applicable Federal, State and local emergency preparedness requirements. The [facility] must develop establish and maintain a comprehensive emergency preparedness program that meets the requirements of this section. The emergency preparedness program must include, but not be limited to, the following elements:
(a) Emergency Plan. The [facility] must develop and maintain an emergency preparedness plan that must be [reviewed], and updated at least every 2 years. The plan must do all of the following:
* [For hospitals at §482.15 and CAHs at §485.625(a):] Emergency Plan. The [hospital or CAH] must comply with all applicable Federal, State, and local emergency preparedness requirements. The [hospital or CAH] must develop and maintain a comprehensive emergency preparedness program that meets the requirements of this section, utilizing an all-hazards approach.
* [For LTC Facilities at §483.73(a):] Emergency Plan. The LTC facility must develop and maintain an emergency preparedness plan that must be reviewed, and updated at least annually.
* [For ESRD Facilities at §494.62(a):] Emergency Plan. The ESRD facility must develop and maintain an emergency preparedness plan that must be [evaluated], and updated at least every 2 years.
.
|
Observations: Name: - Component: -- - Tag: 0004
Based on document review and interview, it was determined the facility failed to provide documentation verifying the emergency preparedness plan had been reviewed within the previous twelve months, which affects the entire component.
Findings include:
1. Review of documentation on August 4, 2026, at 9:50 AM, revealed the facility failed to provide documentation verifying the emergency preparedness plan had been reviewed, since 12/24/21.
Interview with the Director of Environmental Services on August 4, 2026, at 9:50 AM, confirmed the lack of documentation verifying the emergency preparedness plan had been reviewed, since 12/24/21.
| | Plan of Correction - To be completed: 09/17/2026
1 Documentation obtained for emergency preparedness plan all members of the committee have signed off on the annual review face page. 2 Emergency Preparedness (EP) Committee has been educated to conduct an annual review. 3 Audits of Emergency preparedness plan review and documentation will be conducted annually 4 The findings of these quality monitoring's to be reported to the Quality assurance/performance improvement committee monthly x6months
|
|