Pennsylvania Department of Health
MAGEE REHABILITATION HOSPITAL
Building Inspection Results

Note: If you need to change the font size, click the "View" menu at the top of the page, place the mouse over the "Text Size" menu item, and select the desired font size.

Severity Designations

Click here for definitions Click here for definitions Click here for definitions Click here for definitions
Minimal Citation - No Harm Minimal Harm Actual Harm Serious Harm
MAGEE REHABILITATION HOSPITAL
Inspection Results For:

There are  24 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
MAGEE REHABILITATION HOSPITAL - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: BUILDING 01 (EAST) - Component: 01 - Tag: 0000


Facility ID# 135301
Component 01
East Wing

Based on an Occupancy Survey conducted on February 4, 2021, and completed on February 11, 2021, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital Health Care Occupancy.

This Final Occupancy Survey was conducted for Alterations to add one cross-corridor door to the East Wing, add three cross-corridor doors to the West Wing, and modify the Gym Training Kitchen.

Areas Inspected: Third Floor, East Wing Gym, Door 300F2.

Refer to Drawing Numbers: H-20-0200, and H-21-0136.

This is a six story, Type II (000), unprotected, non-combustible construction, which is fully sprinklered.




 Plan of Correction:


Initial comments:Name: BUILDING 02 (WEST) - Component: 12 - Tag: 0000


Facility ID# 135301
Component 12
West Wing

Based on an Occupancy Survey conducted on February 4, 2021, and completed on February 11, 2021, it was determined there were no deficiencies identified as related to the requirements of the Life Safety Code for an existing Hospital Health Care Occupancy.

This Final Occupancy Survey was conducted for Alterations to add one cross-corridor door to the East Wing, add three cross-corridor doors to the West Wing, and modify the Gym Training Kitchen.

Areas Inspected: Third Floor, West Wing, Doors 300A2, 300B2, and 300D2

Refer to Drawing Numbers: H-20-0200, and H-21-0136.

This is a six-story, Type I (222), fire resistive construction, which is fully sprinklered.




 Plan of Correction:



Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port