LOGAN SQUARE REHABILITATION AND HEALTHCARE CENTER
Inspection Results For:

There are  46 surveys for this facility. Please select a date to view the survey results.

Surveys don't appear on this website until at least 41 days have elapsed since the exit date of the survey.
LOGAN SQUARE REHABILITATION AND HEALTHCARE CENTER - Inspection Results Scope of Citation
Number of Residents Affected
By Deficient Practice
Initial comments:Name: - Component: -- - Tag: 0000

Based on an Emergency Preparedness Survey completed on January 31, 2024, it was determined that Logan Square Rehabilitation And Healthcare Center had deficiencies that have the potential for minimal harm as related to the requirements of 42 CFR 483.73.



 Plan of Correction:


403.748(d)(2), 416.54(d)(2), 418.113(d)(2), 441.184(d)(2), 482.15(d)(2), 483.475(d)(2), 483.73(d)(2), 484.102(d)(2), 485.542(d)(2), 485.625(d)(2), 485.68(d)(2), 485.727(d)(2), 485.920(d)(2), 486.360(d)(2), 491.12(d)(2), 494.62(d)(2) STANDARD EP Testing Requirements:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
§416.54(d)(2), §418.113(d)(2), §441.184(d)(2), §460.84(d)(2), §482.15(d)(2), §483.73(d)(2), §483.475(d)(2), §484.102(d)(2), §485.68(d)(2), §485.542(d)(2), §485.625(d)(2), §485.727(d)(2), §485.920(d)(2), §491.12(d)(2), §494.62(d)(2).

*[For ASCs at §416.54, CORFs at §485.68, REHs at §485.542, OPO, "Organizations" under §485.727, CMHCs at §485.920, RHCs/FQHCs at §491.12, and ESRD Facilities at §494.62]:

(2) Testing. The [facility] must conduct exercises to test the emergency plan annually. The [facility] must do all of the following:

(i) Participate in a full-scale exercise that is community-based every 2 years; or
(A) When a community-based exercise is not accessible, conduct a facility-based functional exercise every 2 years; or
(B) If the [facility] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required community-based or individual, facility-based functional exercise following the onset of the actual event.
(ii) Conduct an additional exercise at least every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [facility's] emergency plan, as needed.

*[For Hospices at 418.113(d):]
(2) Testing for hospices that provide care in the patient's home. The hospice must conduct exercises to test the emergency plan at least annually. The hospice must do the following:
(i) Participate in a full-scale exercise that is community based every 2 years; or
(A) When a community based exercise is not accessible, conduct an individual facility based functional exercise every 2 years; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospital is exempt from engaging in its next required full scale community-based exercise or individual facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.

(3) Testing for hospices that provide inpatient care directly. The hospice must conduct exercises to test the emergency plan twice per year. The hospice must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual facility-based functional exercise; or
(B) If the hospice experiences a natural or man-made emergency that requires activation of the emergency plan, the hospice is exempt from engaging in its next required full-scale community based or facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop led by a facilitator that includes a group discussion using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the hospice's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the hospice's emergency plan, as needed.


*[For PRFTs at §441.184(d), Hospitals at §482.15(d), CAHs at §485.625(d):]
(2) Testing. The [PRTF, Hospital, CAH] must conduct exercises to test the emergency plan twice per year. The [PRTF, Hospital, CAH] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the [PRTF, Hospital, CAH] experiences an actual natural or man-made emergency that requires activation of the emergency plan, the [facility] is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an [additional] annual exercise or and that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [facility's] response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the [facility's] emergency plan, as needed.

*[For PACE at §460.84(d):]
(2) Testing. The PACE organization must conduct exercises to test the emergency plan at least annually. The PACE organization must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or
(B) If the PACE experiences an actual natural or man-made emergency that requires activation of the emergency plan, the PACE is exempt from engaging in its next required full-scale community based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or individual, a facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the PACE's response to and maintain documentation of all drills, tabletop exercises, and emergency events and revise the PACE's emergency plan, as needed.

*[For LTC Facilities at §483.73(d):]
(2) The [LTC facility] must conduct exercises to test the emergency plan at least twice per year, including unannounced staff drills using the emergency procedures. The [LTC facility, ICF/IID] must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise.
(B) If the [LTC facility] facility experiences an actual natural or man-made emergency that requires activation of the emergency plan, the LTC facility is exempt from engaging its next required a full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the [LTC facility] facility's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the [LTC facility] facility's emergency plan, as needed.

*[For ICF/IIDs at §483.475(d)]:
(2) Testing. The ICF/IID must conduct exercises to test the emergency plan at least twice per year. The ICF/IID must do the following:
(i) Participate in an annual full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise; or.
(B) If the ICF/IID experiences an actual natural or man-made emergency that requires activation of the emergency plan, the ICF/IID is exempt from engaging in its next required full-scale community-based or individual, facility-based functional exercise following the onset of the emergency event.
(ii) Conduct an additional annual exercise that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the ICF/IID's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the ICF/IID's emergency plan, as needed.

*[For HHAs at §484.102]
(d)(2) Testing. The HHA must conduct exercises to test the emergency plan at
least annually. The HHA must do the following:
(i) Participate in a full-scale exercise that is community-based; or
(A) When a community-based exercise is not accessible, conduct an annual individual, facility-based functional exercise every 2 years; or.
(B) If the HHA experiences an actual natural or man-made emergency that requires activation of the emergency plan, the HHA is exempt from engaging in its next required full-scale community-based or individual, facility based functional exercise following the onset of the emergency event.
(ii) Conduct an additional exercise every 2 years, opposite the year the full-scale or functional exercise under paragraph (d)(2)(i) of this section is conducted, that may include, but is not limited to the following:
(A) A second full-scale exercise that is community-based or an individual, facility-based functional exercise; or
(B) A mock disaster drill; or
(C) A tabletop exercise or workshop that is led by a facilitator and includes a group discussion, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(iii) Analyze the HHA's response to and maintain documentation of all drills, tabletop exercises, and emergency events, and revise the HHA's emergency plan, as needed.

*[For OPOs at §486.360]
(d)(2) Testing. The OPO must conduct exercises to test the emergency plan. The OPO must do the following:
(i) Conduct a paper-based, tabletop exercise or workshop at least annually. A tabletop exercise is led by a facilitator and includes a group discussion, using a narrated, clinically relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan. If the OPO experiences an actual natural or man-made emergency that requires activation of the emergency plan, the OPO is exempt from engaging in its next required testing exercise following the onset of the emergency event.
(ii) Analyze the OPO's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the [RNHCI's and OPO's] emergency plan, as needed.

*[ RNCHIs at §403.748]:
(d)(2) Testing. The RNHCI must conduct exercises to test the emergency plan. The RNHCI must do the following:
(i) Conduct a paper-based, tabletop exercise at least annually. A tabletop exercise is a group discussion led by a facilitator, using a narrated, clinically-relevant emergency scenario, and a set of problem statements, directed messages, or prepared questions designed to challenge an emergency plan.
(ii) Analyze the RNHCI's response to and maintain documentation of all tabletop exercises, and emergency events, and revise the RNHCI's emergency plan, as needed.
Observations:
Name: - Component: -- - Tag: 0039

Based on document review and interview, it was determined the facility failed to conduct the required additional exercise to test the emergency preparedness plan, affecting the entire facility.

Findings include:

Document review on January 31, 2024, at 8:15 a.m., revealed the facility failed to conduct the required additional exercise to test the emergency preparedness plan within the previous 12 months.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the documentation was not available.




 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on policy and procedure for conducting tabletop and full scale emergency preparedness exercises.
- Emergency preparedness exercise completed by facility
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks to ensure emergency preparedness exercises are completed in accordance with policies and procedure. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

Initial comments:Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0000


Facility ID # 127502
Component 01

Based on a Medicare/Medicaid Recertification Survey completed on January 31, 2024, it was determined that Logan Square Rehabilitation and Healthcare Center was not in compliance with the following requirements of the Life Safety Code for an existing Nursing health care occupancy. Compliance with the National Fire Protection Association's Life Safety Code is required by 42 CFR 483.90(a).

This is a twenty-four story, Type II (222), fire resistive building, with two lower-level garages and a basement, that is fully sprinklered. Complete automatic sprinkler protection is provided on the first through fourth floors, as well as the smoke towers and fire exit stair towers used by healthcare residents.




 Plan of Correction:


NFPA 101 STANDARD General Requirements - Other:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
General Requirements - Other
List in the REMARKS section any LSC Section 18.1 and 19.1 General Requirements that are not addressed by the provided K-tags, but are deficient. This information, along with the applicable Life Safety Code or NFPA standard citation, should be included on Form CMS-2567.
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0100

Based on document review and interview, it was determined the facility failed to maintain carbon monoxide alarms in accordance with the 2016 Act 48 - Care Facility Carbon Monoxide Alarms Standards Act, affecting the entire facility.

Findings include:

Document review on January 31, 2024, at 8:15 a.m., revealed the facility failed to test and clean carbon monoxide detectors in accordance with manufacturer's specifications.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the facility did not adhere to the Care Facility Carbon Monoxide Alarms Standards Act.




 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on policy and procedure for testing and cleaning carbon monoxide detectors in accordance with Manufacturer's Specifications.
- All Carbon Monoxide detectors were inspected to ensure they were cleaned and tested for proper functioning.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of carbon monoxide detectors to ensure they are cleaned and working properly. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Illumination of Means of Egress:Least serious deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents. This deficiency has the potential for causing no more than a minor negative impact on the resident.
Illumination of Means of Egress
Illumination of means of egress, including exit discharge, is arranged in accordance with 7.8 and shall be either continuously in operation or capable of automatic operation without manual intervention.
18.2.8, 19.2.8
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0281

Based on document review and interview, it was determined the facility failed to maintain and inspect emergency lighting, affecting the entire facility.

Findings include:

Document review on January 31, 2024, at 8:15 a.m., revealed the facility could not provide documentation of the following tests and inspections:

a. Monthly 30-second testing;
b. Annual 90-minute test.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the lack of documentation.




 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on policy and procedure for testing and emergency lighting testing requirements
- All Emergency lights were tested to ensure they were properly functioning.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of emergency lights to ensure they are functioning properly and are tested in accordance with facility policy. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Sprinkler System - Maintenance and Testing:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0353

Based on observation and interview, it was determined the facility failed to ensure automatic sprinkler components were maintained, affecting one of twenty-four floors.

Findings Include:

Observation on January 31, 2024, at 11:10 a.m., revealed, in the dining area, on the third floor, a sprinkler was missing its escutcheon.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the missing escutcheon.







 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring all sprinkler heads have an escutcheon ring.
- Escutcheon ring was installed to the sprinkler head on the 3rd floor dining room
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Sprinkler heads in the facility to ensure escutcheon rings are installed properly. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Subdivision of Building Spaces - Smoke Barrie:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0374

Based on observation and interview, it was determined the facility failed to ensure doors in smoke barrier walls were maintained to resist the passage of smoke, affecting one of twenty-four floors.

Findings include:

Observation on January 31, 2024, at 11:20 a.m., revealed, on the second floor, the smoke door by room 210 had a cracked wire glass panel.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the doors failed to close smoke tight.






 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring all smoke doors are properly functioning with no smoke penetrations via the door or glass
- Wire Glass Panel on the smoke door was replaced.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Smoke doors to ensure smoke doors are properly functioning and glass is intact. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Utilities - Gas and Electric:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Utilities - Gas and Electric
Equipment using gas or related gas piping complies with NFPA 54, National Fuel Gas Code, electrical wiring and equipment complies with NFPA 70, National Electric Code. Existing installations can continue in service provided no hazard to life.
18.5.1.1, 19.5.1.1, 9.1.1, 9.1.2




Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0511

Based on observation and interview, it was determined the facility failed to maintain protection of electrical equipment and wiring, affecting three of twenty-four floors.

Findings include:

Observation on January 31, 2024, revealed there were deficiencies at the following electrical rooms:

a. 10:15 a.m., upper garage storage room door failed to close and latch.
b. 11:00 a.m., on the third floor, the electrical transformer room had combustible boxes stored within the room.
c. 11:50 a.m., revealed an electrical box missing its protective cover, in the first floor clinic.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the above deficiencies.













 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring electrical wiring and equipment complies with NFPA 70, National electric Code.
- Electrical Box protective cover was installed to 1st floor clinic.
- Upper Garage storage room door to be service by contractor to fix.
- All combustible boxes cleared from 3rd floor electrical room.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Garage storage room doors to ensure proper latching. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Electrical boxes to ensure boxes are equipped with proper cover. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Electrical rooms to ensure no combustible items are stored in the electrical rooms. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Rubbish Chutes, Incinerators, and Laundry Chu:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Rubbish Chutes, Incinerators, and Laundry Chutes
2012 EXISTING
(1) Any existing linen and trash chute, including pneumatic rubbish and linen systems, that opens directly onto any corridor shall be sealed by fire resistive construction to prevent further use or shall be provided with a fire door assembly having a fire protection rating of 1-hour. All new chutes shall comply with 9.5.
(2) Any rubbish chute or linen chute, including pneumatic rubbish and linen systems, shall be provided with automatic extinguishing protection in accordance with 9.7.
(3) Any trash chute shall discharge into a trash collection room used for no other purpose and protected in accordance with 8.4. (Existing laundry chutes permitted to discharge into same room are protected by automatic sprinklers in accordance with 19.3.5.9 or 19.3.5.7.)
(4) Existing fuel-fed incinerators shall be sealed by fire resistive construction to prevent further use.
19.5.4, 9.5, 8.4, NFPA 82
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0541

Based on observation and interview, it was determined the facility failed to maintain the fire resistance rating of chutes and discharge rooms, affecting one of twenty-four floors.

Findings include:

Observation on January 31, 2024, at 11:15 a.m., revealed the second floor trash chute door failed to close and latch when tested.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the chute door deficiency.





 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring all Chute doors properly latch
- 2nd Floor Trash Chute door repaired to ensure proper latching.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Chute doors to ensure proper latching. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Electrical Systems - Essential Electric Syste:This is a less serious (but not lowest level) deficiency but was found to be widespread throughout the facility and/or has the potential to affect a large portion or all the residents.  This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status.
Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70)
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0918

Based on document review and interview, it was determined the facility failed to maintain and inspect the emergency generator, affecting the entire facility.

Findings include:

Document review on January 31, 2023, at 8:15 a.m., revealed the facility could not provide documentation of the following tests and inspections:

a. Monthly testing of battery electrolyte specific gravity or conductance testing;
b. Annual fuel quality test.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the lack of documentation.






 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring Generator battery testing and fuel quality test are completed.
- Generator Battery conductance and Fuel Quality quotes were obtained and testing is scheduled.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks to ensure generator Battery testing and fuel quality sample is completed. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Electrical Equipment - Power Cords and Extens:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Electrical Equipment - Power Cords and Extension Cords
Power strips in a patient care vicinity are only used for components of movable patient-care-related electrical equipment (PCREE) assembles that have been assembled by qualified personnel and meet the conditions of 10.2.3.6. Power strips in the patient care vicinity may not be used for non-PCREE (e.g., personal electronics), except in long-term care resident rooms that do not use PCREE. Power strips for PCREE meet UL 1363A or UL 60601-1. Power strips for non-PCREE in the patient care rooms (outside of vicinity) meet UL 1363. In non-patient care rooms, power strips meet other UL standards. All power strips are used with general precautions. Extension cords are not used as a substitute for fixed wiring of a structure. Extension cords used temporarily are removed immediately upon completion of the purpose for which it was installed and meets the conditions of 10.2.4.
10.2.3.6 (NFPA 99), 10.2.4 (NFPA 99), 400-8 (NFPA 70), 590.3(D) (NFPA 70), TIA 12-5
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0920

Based on observation and interview, it was determined the facility failed to prohibit the unauthorized use of electrical devices affecting two of twenty-four floors.

Findings include:

Observations on January 31, 2024, revealed the following electrical deficiencies:

a. 11:30 a.m.. in the first floor clinic, an extension cord powering a microwave.
b. 11:15 a.m., in the second floor business office, microwave into surge protector.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the unauthorized electrical devices.





 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on ensuring patient care areas are free of extension cords or power strips.
- Microwaves in first floor clinic as well as second floor business office have been disconnected from the extension cord/Power strip
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of patient care areas to ensure extension cords and power strips are not in use. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.

NFPA 101 STANDARD Gas Equipment - Cylinder and Container Storag:This is a less serious (but not lowest level) deficiency and affects more than a limited number of residents, staff, or occurrences. This deficiency is one that results in minimal discomfort to the resident or has the potential (not yet realized) to negatively affect the resident's ability to achieve his/her highest functional status. This deficiency was not found to be throughout this facility.
Gas Equipment - Cylinder and Container Storage
Greater than or equal to 3,000 cubic feet
Storage locations are designed, constructed, and ventilated in accordance with 5.1.3.3.2 and 5.1.3.3.3.
>300 but <3,000 cubic feet
Storage locations are outdoors in an enclosure or within an enclosed interior space of non- or limited- combustible construction, with door (or gates outdoors) that can be secured. Oxidizing gases are not stored with flammables, and are separated from combustibles by 20 feet (5 feet if sprinklered) or enclosed in a cabinet of noncombustible construction having a minimum 1/2 hr. fire protection rating.
Less than or equal to 300 cubic feet
In a single smoke compartment, individual cylinders available for immediate use in patient care areas with an aggregate volume of less than or equal to 300 cubic feet are not required to be stored in an enclosure. Cylinders must be handled with precautions as specified in 11.6.2.
A precautionary sign readable from 5 feet is on each door or gate of a cylinder storage room, where the sign includes the wording as a minimum "CAUTION: OXIDIZING GAS(ES) STORED WITHIN NO SMOKING."
Storage is planned so cylinders are used in order of which they are received from the supplier. Empty cylinders are segregated from full cylinders. When facility employs cylinders with integral pressure gauge, a threshold pressure considered empty is established. Empty cylinders are marked to avoid confusion. Cylinders stored in the open are protected from weather.
11.3.1, 11.3.2, 11.3.3, 11.3.4, 11.6.5 (NFPA 99)
Observations:
Name: MAIN BUILDING 01 (FULLY SPRINKLERED IN LTC AREA) - Component: 01 - Tag: 0923

Based on observation and interview, it was determined the facility failed to maintain storage of oxygen cylinders, affecting one of twenty-four floors.

Findings include:

Observation on January 31, 2024, at 10:40 a.m., revealed an unsecured oxygen cylinder, in the third floor oxygen storage room.

Exit interview with the Administrator and Director of Plant Operations on January 31, 2024, at 12:00 p.m., confirmed the unsecured oxygen cylinder.




 Plan of Correction - To be completed: 03/19/2024

- NHA to in-service Director of Plant Operations on proper storage of oxygen cylinders
- Unsecured oxygen cylinder on 3rd floor was fixed to be secured properly in the oxygen storage room.
- Director of Plant Operations or delegate to complete Audits 3x per week x4 weeks of Oxygen storage room to ensure all oxygen cylinders are stored properly. Audit findings will be submitted to the Quality Assurance Performance Improvement Committee monthly for further review and recommendations as needed. Further audit frequency will be determined based on the outcome of the previously completed audit findings.


Back to County Map


  
Home : Press Releases : Administration
Health Planning and Assessment : Office of the Secretary
Health Promotion and Disease Prevention : Quality Assurance



Copyright © 2001 Commonwealth of Pennsylvania. All Rights Reserved.
Commonwealth of PA Privacy Statement

Visit the PA Power Port